Search results for "Late development"
showing 2 items of 2 documents
Method to Define User Interfaces in the Requirements Analysis Phase
2018
Many requirements for quality in use are elicited in the late development phase. However, if requirements are elicited in the late development phase, the development may return to the previous phase or some requirements cannot be realized due to costs and schedules. To reduce these cases, we propose a method to elicit the requirements in the requirements analysis phase. First, software developers analyze the user characteristics (UCs) of the target users and specify important quality characteristics (QCs) for quality in use and UI design items based on the relationships among UC, QC, and UI design items. Because UI design items are considerations to develop UIs, the specified UI design item…
Optociliary veins and central retinal vein occlusion.
1993
In a follow up of 94 patients with central retinal vein occlusion (CRVO) whose onset had taken place less than 1 year earlier, optociliary veins (OCVs) were found in 7.4% at first examination. Among the 79 eyes in which the fundus of the eye was very visible after a follow up of more than 1 year OCVs were found in 30.4%, showing a late development of OCVs in many cases of CRVO. No difference was found in the occurrence of OCVs between non-ischaemic and ischaemic forms of CRVO. The visual acuity of the eyes with CRVO that developed OCVs was not significantly different from the visual acuity of the eyes without OCVs. Thus, the presence of OCVs in CRVO does not seem to be associated with bette…